DOW-UAP-D187: AAWSAP’s January 2009 status briefing
A January 2, 2009 talking paper prepares DIA Director Michael Maples for a visit by Senator Harry Reid. It records the single BAASS bid, the contract award, twelve research plans, and a satisfactory facility inspection. Its statement that work was on time and within budget is an early management assessment, before the technical reports were due.
- File
- Document · Release 08
- Date
- Jan 2, 2009
- Location
- Washington, D.C.
- Extent
- 1 pages
Search This File
Probed Assessment
Key takeaways
- The record is an early progress report.
- A satisfactory inspection is distinguished from a completed clearance.
- Technical reports were still scheduled for future delivery.
Why it matters
It provides a dated baseline for following the contract from initial organization through later report evaluation.
Corroboration
The paper supports the stated administrative milestones. It contains no technical results demonstrating unconventional aerospace performance.
Probed separates this editorial assessment from the source claims below. It summarizes what the released artifact supports; it is not independent verification.
Official Description from War.gov
This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This document is preparatory material for a scheduled senior leadership meeting involving Senator Harry Reid (D-NV) on 2 January 2009, intended to equip DIA leadership with concise status talking points on the AAWSAP contract in case he raised the subject. The document states that Senators Daniel Inouye (D-HI) and Harry Reid sponsored the July 2008 supplemental appropriations language directing DIA to investigate foreign advanced aerospace threats over a 40-year horizon, and it presents Reid’s interest in aerospace technologies as part of the background for the engagement. It further notes that Bigelow Aerospace Advanced Space Studies had been the only respondent to the August 2008 request for proposals, that its proposal was judged responsive, and that the contract had been signed on 22 September 2008. The document notes that DIA assessed the program to have produced reports of limited value, along with a recommendation that AAWSAP be transitioned to another agency.
Preserved verbatim as source metadata. This wording is separate from Probed’s file-specific description and assessment.
File Context
Related entities
Tracker findings
Talking points prepared Maples for Reid’s visit
The January 2 talking paper prepared Maples for Reid’s January 5 visit and possible questions about the contract.
BAASS submitted twelve technical management plans
BAASS submitted management plans for twelve technical areas on November 21, 2008.
Release provenance
- Release
- Release 08
- Official ID
- release-08-file-016-dow-uap-d187-dia-talking-paper-for-senator-reid-engagement-january-2009
- Cleared
- Nov 20, 2026
Referenced Timeline
Facility inspection completed
The briefing reports a satisfactory DSS site inspection and a pending clearance process.
DIA prepares early contract briefing
The talking paper summarizes progress ahead of Reid’s planned visit.
Source Claims
Claims are attributed to the released source and remain distinct from Probed’s assessment and tracker findings.
The January 2 talking paper prepared Maples for Reid’s January 5 visit and possible questions about the contract.
05 January 2009
DIA reports only one proposal, from BAASS, and a contract signed on September 22, 2008.
DIA received only one bid
BAASS submitted management plans for twelve technical areas on November 21, 2008.
21 November 2008
The Defense Warning Office rated those plans very good to excellent and authorized technical-report work.
very good to excellent.
The Defense Security Service’s December 17, 2008 inspection was satisfactory, while the facility clearance process was still expected to finish shortly.
17 December 2008
The briefing described work as on schedule and within cost, with technical reports expected by late July 2009.
within cost.
Source Material & Evidence
Research Map
Lines appear only when two entities share a row-level source claim or dated timeline event. Unconnected nodes remain visible without implying a relationship.