War.gov PURSUEDepartment of War
GovernmentMay 4, 2009Analysis complete

DOW-UAP-D184: DIA’s May 2009 briefing for Reid

A May 4, 2009 DIA talking paper describes the AAWSAP contract as on schedule and within cost, with BAASS performance rated highly. It outlines twelve technology areas, planned technical reports, and proposed university collaboration. The paper captures a favorable program-management assessment at that time; it does not demonstrate that the technologies under discussion had been achieved.

File
Document · Release 08
Date
May 4, 2009
Location
Washington, D.C.
Extent
2 pages

Probed Assessment

Key takeaways

  • The assessment is favorable but concerns contract performance.
  • Many activities described are future plans.
  • Research into unconventional technology does not establish possession of such technology.

Why it matters

The paper provides a dated management checkpoint that can be compared with later DIA assessments of the same program.

Corroboration

This is DIA’s stated position in May 2009. Later memoranda in this release offer a different assessment of the reports’ intelligence value.

Probed separates this editorial assessment from the source claims below. It summarizes what the released artifact supports; it is not independent verification.

Official Description from War.gov

This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This document is preparatory material for a scheduled senior-leadership meeting involving Senator Harry Reid (D-NV) in May 2009, intended to equip the Director of the DIA with concise status points on the AAWSAP contract should Reid raise the topic. The document states that Senators Daniel Inouye (D-HI) and Harry Reid sponsored the July 2008 supplemental-appropriations language directing DIA to investigate foreign advanced aerospace threats over a 40-year horizon, and it presents Reid’s interest in unconventional aerospace technologies as part of the background for the engagement. It further notes that the request for proposals had sought work across 12 advanced technical areas, that Bigelow Aerospace Advanced Space Studies remained the sole bidder and contract awardee, and that Program Management Plans for all 12 areas had been approved. The talking points also state that approximately two research reports per technical area were expected by the end of July 2009 and that planning had begun for a prospective Fiscal Year 2010 university grant program in advanced aerospace research.

Preserved verbatim as source metadata. This wording is separate from Probed’s file-specific description and assessment.

File Context

Related entities

11

Tracker findings

2

Talking points prepared Burgess for Reid

The paper was prepared for Lieutenant General Burgess in case Senator Reid raised the advanced aerospace contract.

BAASS was the only bidder

DIA reports receiving a single bid, from BAASS, and signing the contract on September 22, 2008.

Release provenance

Release
Release 08
Official ID
release-08-file-013-dow-uap-d184-aawsap-talking-paper-for-senator-reid-engagement-may-2009
Cleared
Nov 20, 2026
Official release source

Referenced Timeline

  1. Page 1

    BAASS contract signed

    The talking paper records the contract signature date.

  2. Page 1

    Program-management plans submitted

    BAASS submitted plans for all twelve technical areas.

    LinkedBAASS
  3. Page 1

    DIA prepares Reid-visit briefing

    The May 4 talking paper summarizes current contract progress for Director Burgess.

Source Claims

Claims are attributed to the released source and remain distinct from Probed’s assessment and tracker findings.

Source reportedAssertedPage 1

The paper was prepared for Lieutenant General Burgess in case Senator Reid raised the advanced aerospace contract.

To provide LTG Burgess

Source reportedAssertedPage 1

The paper credits Senators Reid and Inouye with sponsoring 2008 funding language for a forty-year aerospace threat horizon.

Senator Inouye (D-HI) and Senator Reid (D-Nev)

Source reportedAssertedPage 1

DIA reports receiving a single bid, from BAASS, and signing the contract on September 22, 2008.

contract signed on 22 September 2008.

Source reportedAssertedPage 1

BAASS submitted twelve program-management plans on November 21, 2008; DIA rated them very good to excellent.

21 November 2008

Source reportedAssertedPage 1

DIA expected approximately two detailed research reports per technical area in fiscal 2009, with publication targeted for late July.

two detailed research reports per technical area

Source Material & Evidence

document

DOW-UAP-D184: official source document

DOW-UAP-D184, AAWSAP Talking Paper for Senator Reid Engagement, May 2009; War.gov UFO Files, Release 08

Research Map

11 entities · 8 grounded links

Lines appear only when two entities share a row-level source claim or dated timeline event. Unconnected nodes remain visible without implying a relationship.

UAP/Disclosure Graph
11 nodes8 links